Trade account order · Garage and boundary wall, Goole

AR-41293

Sent to Xero
Tingle Construction, builder, trade account at Band C. Placed on the Tingle Construction trade account by Rob Chapman on Wed 7 Oct at 09:53 (their ref PO 3434). Own hiab for Tue 13 Oct to Garage and boundary wall, Goole. Owner Ellie Marsden.
Total, inc VAT
£2,097.60
£1,748.00 ex VAT + £349.60 VAT
Margin
30.0%
floor 12% a line
Tingle Construction
Lines at Tingle Construction’s own prices
Prices ex VAT: contract price first, then Band C; never under cost plus 12%
ex VAT
ProductQtyEachLineFrom
Engineering brick, red, 75mm
NEB-R75-424 · Pack of 424 bricks
4 packs
1,696 bricks
£437.00
Band C
£1,748.00
PO-3112 · 4 packs
Net, ex VAT£1,748.00
VAT at 20%£349.60
Total£2,097.60
4 pallets on the hiab. Every line clears the 12% margin floor.
Where each pack comes from
The lots it left the yard from, oldest stock first
Yard map →
4 packs, 1,696 bricks of Engineering brick, red, 75mm
PO-3112 New, from Northern Clay Distribution · delivered 5 Nov
Left13 Oct
Checked as it landed
price, stock and credit, before anyone touched it
£price
Priced at their rate
1 at Band C. Every line clears the 12% margin floor.
▦stock
Stock kept
Every line was available and kept for this order as it was read.
✓credit
Within the limit
Passed when it landed: inside the £6,500 limit.
As it arrived
Placed on a trade account; priced at the account’s band and invoiced on its terms
Trade account order7 Oct 09:53
Rob Chapman, Tingle ConstructionTheir ref PO 3434
ItemQtyTheir price
Engineering brick, red, 75mm, pack of 4244£437.00
Placed on the Tingle Construction trade account; priced at Band C and invoiced on 30 days end of month.
What they placed
  1. Engineering brick, red, 75mm, pack of 424 x 44 x NEB-R75-424
Placed from their own price list; nothing typed twice.
Delivery
HI
Own hiab
Hiab 2, brick grab, YK19 HBG, Mick
DeliverTue 13 Oct
ToGarage and boundary wall, Goole, DN14
Load4 pallets
RunHull and East Riding, drop 1 of 7
Signed forR. Chapman at 07:48, photo taken
Slot bookedAM, 7:30 to 12:00
Booked by phone with Rob by Ellie, on 7 Oct 12:39.
INV-52962Sent to Xeronot due yet
Dated13 Oct 2026
Due30 Nov 2026 (30 days end of month)
Total£2,097.60 inc VAT
Sent to Xero at 18:00 on 13 Oct from the delivered quantities. Nothing re-typed; Xero stays the ledger.
Customer
TC
Tingle Construction
T-1094 · Builder · Goole
ContactRob Chapman, contracts manager
Phone01632 960751
PricesBand C, 5% off list
Terms30 days end of month
Credit£4,511 of £6,500
Usually byTrade account
Short stockpart-ship and back-order
Timeline
Rob placed it on the Tingle Construction trade account (PO 3434)
Customer · 7 Oct 09:53
Priced at the Tingle Construction account rates: 1 at Band C
Auto · 7 Oct 09:54
Stock kept for this order; the three stores show the new count
Auto · 7 Oct 09:54
Credit checked: within the £6,500 limit
Auto · 7 Oct 09:54
Slot booked with Rob: Tue 13 Oct, AM, 7:30 to 12:00 on the Hull and East Riding run
Ellie · 7 Oct 12:39
Picked by Kyle from PO-3112, checked by Gary
Yard · 12 Oct 13:40
Loaded on Hiab 2, brick grab (YK19 HBG)
Mick · 13 Oct 07:00
Delivered, signed for by R. Chapman. Photo on the driver’s phone
Mick · 13 Oct 07:48
Invoice INV-52962 sent to Xero from the delivered quantities. Nothing re-typed
Auto · 13 Oct 18:00