Suppliers
One brick maker and 3 merchants deliver new bricks, walling stone and sleepers in 4 to 7 days; 2 open orders worth £29,937, and Northern Clay Distribution is the one to watch, 88% on time. Reclaimed stock comes from 8 demolition contractors and the own salvage team: 14 lots in the last six weeks, £34,810 paid.
Order to bay
Days from sending a PO to booking it in at Aire Works. Every reorder point is built on these: what sells in this time, plus a week to spare.
Dalesway Stone SupplySkipton · 3 lines
4 days
96% on timePO-3116 waiting for an OK
Northern Clay DistributionNorthallerton · 1 line
5 days
88% on timePO-3114 due 13 Nov
Pennine Timber SalvageBradford · 3 lines
6 days
92% on timeNothing open
Hollin BrickworksStoke-on-Trent · 2 lines
7 days
94% on timePO-3115 due 16 Nov
Brick makers and merchants · bought on a purchase order
| Supplier | Lead time | On time | Min order | Lines | Stock at cost | Received, 3 wks | Open |
|---|---|---|---|---|---|---|---|
| Dalesway Stone Supply Merchant, Skipton. Walling stone in bulk bags: tumbled farmhouse, grey limestone, gold | 4 days | 96% | £1,200 | 3 2 need stock | £3,718 | £4,728 | PO-3116 draft |
| Northern Clay Distributionwatch Merchant, Northallerton. New engineering bricks: 75mm red engineering brick | 5 days | 88% | £2,000 | 1 1 need stock | £5,504 | £21,406 | 1 PO, £20,794 next 13 Nov |
| Pennine Timber Salvage Merchant, Bradford. Reclaimed hardwood railway sleepers, by the load | 6 days | 92% | £1,500 | 3 | £19,229 | £6,725 | none |
| Hollin Brickworks Brick maker, Stoke-on-Trent. New engineering bricks: 65mm solid red, 75mm imperial red | 7 days | 94% | £2,500 | 2 | £19,174 | £6,341 | 1 PO, £9,142 next 16 Nov |
Demolition contractors · bought by the lot, 75 lots since 4 Feb
Reclaim intake →| Contractor | Lots | Last 6 weeks | Paid, all lots | Good bricks | Latest lot |
|---|---|---|---|---|---|
| Brayfield Demolition Demolition contractor, Thirsk. Mill and chapel demolition, North Yorkshire | 8 feeds 14 lines | 2 lots £6,240 | £17,380 | 77% after cleaning | RL-0400 Arrived Chapel and schoolroom, Harrogate · 10 Nov |
| Calder Salvage Co Demolition contractor, Wetherby. Chapel, school and mill demolition | 9 feeds 12 lines | 2 lots £7,110 | £21,180 | 77% after cleaning | RL-0399 Arrived Mill chimney base, Wetherby · 9 Nov |
| Kirkstall Strip-Out Demolition contractor, Leeds. Terraces, garden walls and outbuildings around Leeds | 13 feeds 10 lines | 2 lots £3,980 | £18,140 | 78% after cleaning | RL-0398 Cleaning Garden walls, Wakefield · 4 Nov |
| Own salvage team Our own team, Leeds. Dismantling jobs we take on ourselves | 11 feeds 7 lines | 2 lots £2,190 | £17,590 | 76% after cleaning | RL-0397 Cleaning Farm buildings, Knaresborough · 2 Nov |
| Kirkby Brook Demolition Demolition contractor, Beverley. Terraced streets and pit-village housing | 8 feeds 15 lines | 1 lot £1,640 | £11,450 | 81% after cleaning | RL-0396 Cleaning Terraced street, Beverley · 30 Oct |
| Moorend Clearance Demolition contractor, Bradford. Brewery and industrial clearance | 6 feeds 11 lines | 1 lot £1,750 | £14,870 | 85% after cleaning | RL-0395 Cleaning Brewery, Northallerton · 28 Oct |
| Thornbeck Demolition Demolition contractor, Leeds. Warehouse and school strip-outs | 6 feeds 7 lines | 2 lots £5,440 | £18,680 | 79% after cleaning | RL-0393 QC Warehouse strip-out, Leeds · 26 Oct |
| Ashworth and Dyson Demolition contractor, Skipton. Railway arches and city-centre demolition | 5 feeds 16 lines | 1 lot £3,350 | £8,290 | 68% after cleaning | RL-0394 QC Railway arches, Skipton · 26 Oct |
| Meanwood Salvage Demolition contractor, Leeds. Cottage rows and Victorian housing | 9 feeds 5 lines | 1 lot £3,110 | £28,880 | 83% after cleaning | RL-0392 In stock Cottage row, Armley, Leeds · 23 Oct |