Phone order · Two-storey extension, Elland
AR-41687
OutOld price stoppedFurness Construction, builder, trade account at Band C. Phoned in by Amanda Moss on Mon 2 Nov at 12:51; keyed once by Josh during the 8 minute call. Own hiab for Wed 11 Nov to Two-storey extension, Elland. Owner Josh Kenyon.
Total, inc VAT
£1,679.57
£1,399.64 ex VAT + £279.93 VAT
Margin
21.7%
floor 12% a line
About this order
Keyed at last year’s price from memory. The margin floor stopped it and priced it at the account’s band.
Lines at Furness Construction’s own prices
Prices ex VAT: contract price first, then Band C; never under cost plus 12%
| Product | Qty | Each | Line | From |
|---|---|---|---|---|
Engineering brick, solid red, 65mm NEB-RED65-380 · Pack of 380 bricks Carried £261.00, under the £273.91 cost: stopped by the margin floor | 4 packs 1,520 bricks | £349.91 Band C was £261.00 | £1,399.64 +£355.64 kept | PO-3105 · 4 packs |
Net, ex VAT£1,399.64
VAT at 20%£279.93
Total£1,679.57
4 pallets on the hiab. Every line clears the 12% margin floor.
Where each pack comes from
The lots it left the yard from, oldest stock first
4 packs, 1,520 bricks of Engineering brick, solid red, 65mm
PO-3105 New, from Hollin Brickworks · delivered 25 Sep
Checked as it landed
price, stock and credit, before anyone touched it£price
Old price stopped
One line carried a price under the margin floor and was priced at the account’s rate instead. 1 at Band C.
▦stock
Stock kept
Every line was available and kept for this order as it was keyed.
✓credit
Within the limit
£1,680 of the £3,500 limit in use with this order.
As it arrived
Keyed once while the customer is on the line; card taken or put on accountIncoming call2 Nov 12:51
Amanda Moss, 0113 496 0352answered by Josh Kenyon
8 minute call. Keyed once while Amanda was on the line; each line priced and checked for stock as it was typed.
- 4Engineering brick, solid red, 65mm, pack of 380
How it was keyed
- 4 x Engineering brick, solid red, 65mm, pack of 3804 x NEB-RED65-380
Keyed once while Amanda was on the line; nothing typed twice.
Delivery
The run →HI
Own hiab
Hiab 2, brick grab, YK19 HBG, Mick
DeliverWed 11 Nov
ToTwo-storey extension, Elland, HX5
Load4 pallets
RunWakefield and Calderdale, drop 8 of 8
Dueabout 13:44
Slot bookedFirst drop
Agreed on the order call with Amanda, keyed by Josh.
Invoice
Invoicing →Not yet. Once it is signed for, the invoice is made from the delivered quantities and sent to Xero at 18:00 that evening, on 30 days end of month.
Customer
FCFurness Construction
T-1037 · Builder · Elland
ContactAmanda Moss, site manager
Phone0113 496 0352
PricesBand C, 5% off list
Terms30 days end of month
Credit£1,680 of £3,500
Usually byWhatsApp
Short stockpart-ship and back-order
Timeline
Amanda phoned the order in; Josh keyed it once (8 min call)
Josh · 2 Nov 12:51
Priced at the Furness Construction account rates: 1 at Band C
Auto · 2 Nov 12:52
Margin floor stopped Engineering brick, solid red, 65mm, pack of 380 at £261.00 (cost £273.91, floor £311.27); priced at £349.91, £355.64 kept
Auto · 2 Nov 12:52
Stock kept for this order; the three stores show the new count
Auto · 2 Nov 12:52
Credit checked: within the £3,500 limit
Auto · 2 Nov 12:52
Slot booked with Amanda: Wed 11 Nov, first drop on the Wakefield and Calderdale run
Josh · 2 Nov 12:59
Picked by Adam from PO-3105, checked by Gary
Yard · Yesterday 13:40
Loaded on Hiab 2, brick grab (YK19 HBG)
Mick · Today 07:00
Due about this time
Planned · Today 13:44